Historic Birmingham Mineral Railroad Signs Project — The BMRR Past and Present!
Vulcan-in-pieces-Retouched beside BMRR tracks Feb 1905
February 1905: Vulcan is shipped back to Birmingham from the St. Louis World’s Fair. He lays in pieces along the railroad tracks of the Birmingham Mineral Railroad for 18 months.
Source: http://visitvulcan.com/about/timeline/